HIGHLIGHTED WORKS
HIGHLIGHTED WORKS

Some works:

Execution projects and Contruction Managemet of the following wind farms:

  • Pico Gallo (Tineo-Asturias) 24,4 MW
  • Sierra de Bodenaya (Salas-Asturias) 18 MW
  • Penouta (Boal-Asturias) 5,9 MW

Draft projects of wond farms an E.I.A.:

  • Ablaniego
  • Monte Buño
  • Pico Aguión
  • Pico Gárabo
  • Puerto de Gijón
  • Sierra de Tineo

Photovoltaic Energy:

  • Project Manager at the “La Magascona” Photovoltaic plant (Trujillo – Cáceres)
    • Power installed: 20 MW
    • Developer: FOTOWATIO S.A.,
    • Modules: Suntech 160 – 260 Wp
    • Support structure: Powerlight horizontal axis tracker
    • Investment: €150 M
    • Start of works: November 2006
    • Property engineering: PROCINSA Ingeniería, S.A.
    • Evacuation line: 4 km. at 132 kV
    • Connection point: Trujillo substation

  • Construction project for the 1.1 MW "La Gasca" photovoltaic plant in Valladolid and connection to a 13.2 kV Iberdrola line.

  • Construction project for the 1.8 MW "La Vega" photovoltaic plant in Seville and connection to a 15 kV Medina Garvey, S.A. power line.

Electrical evacuation lines

  • Project for the 1.8 MW photovoltaic facility in Aznalcázar (Seville) and connection to a 15 kV Medina Garvey, S.A. power line.
  • Project for the 1 MW photovoltaic facility in Carpio (Valladolid) and connection to a 13.2 kV Iberdrola power line.
  • Power connection project (connecting Pico Gallo with Viesgo, with a 132 kV evacuation line from the Tineo Wind Energy Park and 132/400 kV REE Substation).
  • Draft projects for 132 kV evacuation lines for the Wind Energy Plan in the Principality of Asturias.