Some works:
Execution projects and Contruction Managemet of the following wind farms:
- Pico Gallo (Tineo-Asturias) 24,4 MW
- Sierra de Bodenaya (Salas-Asturias) 18 MW
- Penouta (Boal-Asturias) 5,9 MW
Draft projects of wond farms an E.I.A.:
- Ablaniego
- Monte Buño
- Pico Aguión
- Pico Gárabo
- Puerto de Gijón
- Sierra de Tineo
Photovoltaic Energy:
- Project Manager at the “La Magascona” Photovoltaic plant (Trujillo – Cáceres)
- Power installed: 20 MW
- Developer: FOTOWATIO S.A.,
- Modules: Suntech 160 – 260 Wp
- Support structure: Powerlight horizontal axis tracker
- Investment: €150 M
- Start of works: November 2006
- Property engineering: PROCINSA Ingeniería, S.A.
- Evacuation line: 4 km. at 132 kV
- Connection point: Trujillo substation
- Construction project for the 1.1 MW "La Gasca" photovoltaic plant in Valladolid and connection to a 13.2 kV Iberdrola line.
- Construction project for the 1.8 MW "La Vega" photovoltaic plant in Seville and connection to a 15 kV Medina Garvey, S.A. power line.
Electrical evacuation lines
- Project for the 1.8 MW photovoltaic facility in Aznalcázar (Seville) and connection to a 15 kV Medina Garvey, S.A. power line.
- Project for the 1 MW photovoltaic facility in Carpio (Valladolid) and connection to a 13.2 kV Iberdrola power line.
- Power connection project (connecting Pico Gallo with Viesgo, with a 132 kV evacuation line from the Tineo Wind Energy Park and 132/400 kV REE Substation).
- Draft projects for 132 kV evacuation lines for the Wind Energy Plan in the Principality of Asturias.
|